Record Condition: Near Mint (NM or M-) (see detailed item description below)
Sleeve Condition: Near Mint (NM or M-) (see detailed item description below)
Country of Manufacture: Ireland
Year of Manufacture: 06 Nov 2015
Genre: Rock
Style: Doom Metal, Noise, Progressive Metal, Sludge Metal
Item Condition:
Lovely copy looks and plays great
Release / Pressing Details:
A1. Macerator
A2. Invasion Of Minds
A3. Daughters
B4. The Big Idea
B5. Golden Curches
B6. Reflections Through Time
Barcode and Other Identifiers:
Data provided by Discogs